Client
Budget and Construction Control
Excel is making you lose money. Track every dollar of your project and avoid 18% in cost overruns.
The challenge
The project was controlled in Excel, with no traceability of advances, certificates and real cost per chapter.
Our solution
We developed initial budget module, unit price analysis, work certificates, advances, cut-offs and budget vs actual comparison with automatic alerts.
18%
Overcost Savings
Real-time
Cash Flow
100%
Advance Traceability
It's not a fancy Excel sheet. It's the system that stops your project from eating your profit.
Impact & results
- 18% savings in cost overruns
- Cash flow per project in real time
- Monthly closings from 5 days to 2 hours
- Total traceability of contractor advances
Screens Gallery
Ready to secure your operation?
Let’s talk about optimizing your critical processes with no strings or monthly licenses attached.
ES
EN